Curated Architectural Gallery
Featured Views
2800 Square Feet 4BHK Kerala Luxury Home Design With Plan
CAD / Floor Plan previewDetailed Spatial Schedule & Dimensions
| Space / Room | Dimensions | Notes |
|---|---|---|
| Built-up Area | 1,650 Sq Ft | Kerala Modern |
| Bedrooms | 3 BHK | Residential configuration |
| Plot Fit | 5.5 - 7.5 Cents | East Facing |
Design Overview



Depending on where it is house, building time, it can be affected by the regions of the country – mid-Atlantic house at about 9.5 months to complete from the average start area, mountain area around 6 months while the average of the construction. Construction in the metropolitan area is faster than usual – construction workers in more rural areas.Although you can do a lot of work in the rain, as such a trench, or a tree felling compared to 9 months, 7 months, because of the rain that there are some things that can hold up, “Kyle Alfriend, Dublin, Alfriend groups and real estate agents in Ohio says” the primary weather factors -. winter including a freeze – because of the large number of ground saturation foundation and spring rain that they can not be dug for no basement caving wall in the hole, the injection of concrete is prohibited. “
Estimated Construction Cost
Construction cost is an indicative estimate and can vary with location, material selection, labour rates and finish grade.
Home Pictures
Architectural information supplied with this house plan. Contact Home Pictures for enquiries or customisation.